Plough  |
The cable Plough can bury telecommunication cables, power
cables and oilfield umbilical either as they are laid, or in a post lay
burial mode.
The Plough is primarily intended for use in simultaneous lay and buries
operations. For simultaneous lay and burial the lay cable touches down
on the seabed ahead of the Plough. As the Plough moves forward it picks
the cable up off the seabed and buries it. This technique is made possible
by the steering mechanism which allows the Plough to track along the cable
without moving it sideways across the seabed. Cables with a low submerged
weight may be laid directly into the bellmouth at the front of the Plough.
In this mode of operation the Plough is deployed and recovered with the
lay cable passing through the Plough and with the tow cable and umbilical
connected. The system is diver less in normal operation. Post-lay burial
operations will require the use of divers to load and unload the cable
on the seabed.

|
|
|